Skip to content
Calitown

Calitown

News, Here, Everytime!

  • Home
  • News
    • Cross River News
  • Features
  • Community
  • Inspirational
  • Toggle search form
  • Court Orders UniCal To Pay N55 Million Naira To Eight Students  News
  • See Full List Of Newly Elected CRS Working Committee Of The All Progressives Congress, APC  News
  • Ayade At 58: Otu Celebrates Ex-Governor’s Visionary Legacy News
  • Report On Efforts Towards The Resolution Of Salary Concerns In Unicross News
  • Of Oil Wells, Greed: Nigeria In A Bubble Of Self-Denial News
  • Assemblyman Condemns Burning Of Catholic Church In Cross River News
  • Owan Enoh Mourns Brother, Burial Fixed For March 3, 2026! News
  • Greed, Avarice and Mendacity: The Portrait Of Obong Victor Attah As Amnesiac, Opportunist News

FG Flags Off 73km Calabar-Ogoja Federal Highway Rehabilitation

Posted on January 29, 2019 By Admin No Comments on FG Flags Off 73km Calabar-Ogoja Federal Highway Rehabilitation
Part of the road being asphalted.

The Minister of Power, Works and Housing, Babatunde Fashola, has flagged off the rehabilitation of the 73km Odukpani Junction-Ikot Okopra-Akpet 1 section of the Calabar-Ikom-Ogoja road.

The News Agency of Nigeria (NAN) reports that the Minister flagged off the rehabilitation of the road on Monday in Biase local government area of Cross River.

Mr Fashola said the project, which would cost N14, 017, 170, 597.90, is a demonstration of the commitment of President Muhammadu Buhari’s administration to bridge the infrastructural gap in the country.

He said this was geared towards providing the much needed stimulants for economic growth and ease of doing business.

The project handled by a local contractors, Sermatech Construction Company, is expected to be completed in 24 months.

Mr Fashola, who was represented by the Minister of State in the Ministry, Mustapha Baba-Shehuri, said the federal government is investing heavily in the provision of critical infrastructure with at least one ongoing road project per state.

“This project is a 73km single carriage way. It links the industrial town of Akamkpa to Biase-Yakurr road. Its frequent plying by industrialists around the area led to its deterioration.

“The shoulders of the road have been completely eroded, while the entire alignment is riddled with alligator cracks, as well as characterized by potholes.

“The scope of work for the contract entails site clearance of shoulders, scarification of the existing failed carriage way and the provision of asphaltic concrete surfacing.

“The scope of work also include, surface dressing of shoulders, concrete lined drains, de-silting of blocked culverts, reinforced concrete pipe culverts among others.

“When completed, the road will greatly reduce vehicle operation maintenance cost, improve travel time, reduce accidents, as well as loss of lives and properties.

“It will also enhance the socio-economic wellbeing of the people along the corridor, generate employment opportunities for both skilled and unskilled labour and assist in the fight against crime,” he said.

The Director in charge of Highways, Construction and Rehabilitations in the Ministry, Yemi Oguntominiyi, said the massive infrastructure development was embarked on by the present administration across the six geopolitical zones in the country.

According to Mr Oguntominiyi, the rehabilitation is aimed at providing the much needed impetus to stimulate the economy and improve the lives of the people.

The minister and his entourage also inspected other completed and ongoing rehabilitation projects along the Calabar-Ikom-Ogoja federal highway led by the Federal Controller of Works in the state, Bassey Nsentip.

(NAN)

Subscribe to Our Newsletter

Get the latest news, articles, and updates delivered straight to your inbox.

We don’t spam! Read our privacy policy for more info.

Check your inbox or spam folder to confirm your subscription.

Share this post:

Share on X (Twitter) Share on Facebook Share on Pinterest Share on LinkedIn Share on Email Share on WhatsApp Share on Telegram
Cross River News, News Tags:Calabar - Ogoja Highway

Post navigation

Previous Post: APC Cross River State Waiting for Gordot…
Next Post: “I Choose To Decamp To APC Before Buhari” – Bolaji Anani

Related Posts

  • INEC Issues Certificate Of Return To CR Governor-Elect Cross River News
  • Gov. Ayade Appoints BBNaija’s Gedoni As Special Assistant Breaking News
  • Buhari ‘Sacks’ CJN Onnoghen, Swears In Mohammed Cross River News
  • Boje/Nsadop Communities Embrace Peace, Commend Catholic Church’s Role Cross River News
  • Ben Akak Commissions Water Project In Ugep, Monarch Happy Cross River News
  • “Your Leadership Lit A Path That Guides Us Today” – Otu Extols Duke at 64 News

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Recent Comments

  • Maurice Eneji on Owan Enoh Mourns Brother, Burial Fixed For March 3, 2026!
  • Ata-okongo Akwa Ibom on Greed, Avarice and Mendacity: The Portrait Of Obong Victor Attah As Amnesiac, Opportunist
  • Eno Ekpenyoung on Gov Otu Hails Chief Okoi Obono-Obla At 56, Describes Him As A Beacon Of Justice
  • Fayman on A Shared Love: Reflections On Iwara Iwara’s Journalistic Odyssey As He Adds Another Year!

ADVERT: Click to Watch!

https://calitown.com/wp-content/uploads/2017/10/VID-20170928-WA0003.mp4
  • Briefly, Meet The Cross Riverian Who Is Nigeria’s New Ambassador To Italy Cross River News
  • CR: Unidentified Gunman Fatally Shoots Mobile Policeman At Checkpoint Cross River News
  • We Live To Die Features
  • PRESS RELEASE: Disregard The Latest Mischief Against Peter Akpanke News
  • CR: List Of First Set Of Commissioners Out! Breaking News
  • Speaker CRS House Of Assembly Wants State Sports Commission To Upgrade Sports Content Cross River News
  • What Do You Know? News
  • Ayade Fails To Honour Promise As WAEC Re-opens Calabar Office News

CALITOWN
...News, Here, Everytime

Quick Menu

  • Home
  • News
    • Cross River News
  • Features
  • Community
  • Inspirational

Copyright © 2021 calitown
172 Greenwood Avenue , Hull. East Yorkshire. HU6 9NY

Powered by PressBook News WordPress theme