Skip to content

Calitown

News, Here, Everytime!

  • Home
  • News
    • Cross River News
  • Features
  • Community
  • Inspirational
  • Toggle search form
  • Obubra/Etung Fed Constituency: How Long Will You Mourn Over Saul? Features
  • Peter Obi Says Nigeria’s Failed Leadership Failed Unical Dentistry Students Cross River News
  • Unicross Holds Historic Senate Meeting, Announce New DVCs Cross River News
  • C’River Takes Delivery Of Two New Aircraft Cross River News
  • JUST IN: Jarigbe Agom Resumes Legislative/Constituency Duties After Medical Break! Cross River News
  • HORROR: Man Butchers Man To Death Over Girlfriend In Ogoja Cross River News
  • VC Initiate Moves To Resolve Dentistry Department Crisis In Unical  Cross River News
  • Yakurr Youths Group Shuns Cultism, Makes Peace Pledge Cross River News

FG Flags Off 73km Calabar-Ogoja Federal Highway Rehabilitation

Posted on January 29, 2019 By Admin No Comments on FG Flags Off 73km Calabar-Ogoja Federal Highway Rehabilitation
Part of the road being asphalted.

The Minister of Power, Works and Housing, Babatunde Fashola, has flagged off the rehabilitation of the 73km Odukpani Junction-Ikot Okopra-Akpet 1 section of the Calabar-Ikom-Ogoja road.

The News Agency of Nigeria (NAN) reports that the Minister flagged off the rehabilitation of the road on Monday in Biase local government area of Cross River.

Mr Fashola said the project, which would cost N14, 017, 170, 597.90, is a demonstration of the commitment of President Muhammadu Buhari’s administration to bridge the infrastructural gap in the country.

He said this was geared towards providing the much needed stimulants for economic growth and ease of doing business.

The project handled by a local contractors, Sermatech Construction Company, is expected to be completed in 24 months.

Mr Fashola, who was represented by the Minister of State in the Ministry, Mustapha Baba-Shehuri, said the federal government is investing heavily in the provision of critical infrastructure with at least one ongoing road project per state.

“This project is a 73km single carriage way. It links the industrial town of Akamkpa to Biase-Yakurr road. Its frequent plying by industrialists around the area led to its deterioration.

“The shoulders of the road have been completely eroded, while the entire alignment is riddled with alligator cracks, as well as characterized by potholes.

“The scope of work for the contract entails site clearance of shoulders, scarification of the existing failed carriage way and the provision of asphaltic concrete surfacing.

“The scope of work also include, surface dressing of shoulders, concrete lined drains, de-silting of blocked culverts, reinforced concrete pipe culverts among others.

“When completed, the road will greatly reduce vehicle operation maintenance cost, improve travel time, reduce accidents, as well as loss of lives and properties.

“It will also enhance the socio-economic wellbeing of the people along the corridor, generate employment opportunities for both skilled and unskilled labour and assist in the fight against crime,” he said.

The Director in charge of Highways, Construction and Rehabilitations in the Ministry, Yemi Oguntominiyi, said the massive infrastructure development was embarked on by the present administration across the six geopolitical zones in the country.

According to Mr Oguntominiyi, the rehabilitation is aimed at providing the much needed impetus to stimulate the economy and improve the lives of the people.

The minister and his entourage also inspected other completed and ongoing rehabilitation projects along the Calabar-Ikom-Ogoja federal highway led by the Federal Controller of Works in the state, Bassey Nsentip.

(NAN)

Share this post:

Share on X (Twitter) Share on Facebook Share on Pinterest Share on LinkedIn Share on Email Share on WhatsApp Share on Telegram
Cross River News, News Tags:Calabar - Ogoja Highway

Post navigation

Previous Post: APC Cross River State Waiting for Gordot…
Next Post: “I Choose To Decamp To APC Before Buhari” – Bolaji Anani

Related Posts

  • Cross River Central Senatorial District 2019: Much Ado About Zoning Cross River News
  • CRSG/First Bank Settle Rift, Bank Reopens Cross River News
  • Donations Pour In For Unical Female Law Graduate … Law School In Sight! Cross River News
  • Normalcy Returns To Calabar As Govt Wades Into Police/Navy Fracas Cross River News
  • See Video Of The Two Prison Warders Killed In The Anambra Attack News
  • “It Is Not True That Anybody’s Name Has Replaced My Name” – Owan Enoh Breaking News

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Recent Comments

  • Tony Nyong on On The 77 Oil Wells & The Supreme Court Judgement: CRS Still Has Subsisting Legal & Potential Arguable Claim To Justify The Ownership Of The Wells
  • Elemi Alaga on On The 77 Oil Wells & The Supreme Court Judgement: CRS Still Has Subsisting Legal & Potential Arguable Claim To Justify The Ownership Of The Wells
  • Kelvin hart on UNICAL: Shock As 300 Dental Students Discover Dept Had No Accreditation 
  • Anonymous on UNICAL: Shock As 300 Dental Students Discover Dept Had No Accreditation 

ADVERT: Click to Watch!

https://calitown.com/wp-content/uploads/2017/10/VID-20170928-WA0003.mp4
  • Cross River Online Journalists To Interact With Guber Aspirants News
  • “Go And Protect The Food On Your Table” – Ayade To Aides Cross River News
  • Read Full Text Of Post Primary Election Press Conference By C’River PDP Governorship Candidate, Sandy Onoh Features
  • Diplomat Stands Between Imoke’s COS And Reps Ambition News
  • As Good As A-R-S-E-N-A-L! Inspirational
  • CR: APC’s Gubernatorial Candidate In Commanding Lead Cross River News
  • Trouble Looms As Youths/Fuel Vendors May Face Off In Obudu Cross River News
  • “Goddy Agba Is Capable Of Being CR Gov” – Uti Agba News

CALITOWN
...News, Here, Everytime

Quick Menu

  • Home
  • News
    • Cross River News
  • Features
  • Community
  • Inspirational

Copyright © 2021 calitown
172 Greenwood Avenue , Hull. East Yorkshire. HU6 9NY

Powered by PressBook News WordPress theme