Skip to content
Calitown

Calitown

News, Here, Everytime!

  • Home
  • News
    • Cross River News
  • Features
  • Community
  • Inspirational
  • Toggle search form
  • Why Cross River’s Oil-Producing Status Is Grounded In Law, Science, Geology & Constitutional Process – Not In The 2012 Supreme Court Decision News
  • Gov Otu: The Day Academia & Media Spoke With One Voice News
  • “Ikpeme, UCTH CMD Has No Case To Answer” – Onwe News
  • Akpanke Keeps Promise, Commissions Three Classroom Block For Obudu Community News
  • Senator Jarigbe Debunks Allegations Of Turning Cross River North Contracts Into Family Business News
  • A Shared Love: Reflections On Iwara Iwara’s Journalistic Odyssey As He Adds Another Year! News
  • 2026 Aspire Foundation Schools Quiz Competition Has Winner! News
  • PRESS RELEASE: Disregard The Latest Mischief Against Peter Akpanke News

FG Flags Off 73km Calabar-Ogoja Federal Highway Rehabilitation

Posted on January 29, 2019 By Admin No Comments on FG Flags Off 73km Calabar-Ogoja Federal Highway Rehabilitation
Part of the road being asphalted.

The Minister of Power, Works and Housing, Babatunde Fashola, has flagged off the rehabilitation of the 73km Odukpani Junction-Ikot Okopra-Akpet 1 section of the Calabar-Ikom-Ogoja road.

The News Agency of Nigeria (NAN) reports that the Minister flagged off the rehabilitation of the road on Monday in Biase local government area of Cross River.

Mr Fashola said the project, which would cost N14, 017, 170, 597.90, is a demonstration of the commitment of President Muhammadu Buhari’s administration to bridge the infrastructural gap in the country.

He said this was geared towards providing the much needed stimulants for economic growth and ease of doing business.

The project handled by a local contractors, Sermatech Construction Company, is expected to be completed in 24 months.

Mr Fashola, who was represented by the Minister of State in the Ministry, Mustapha Baba-Shehuri, said the federal government is investing heavily in the provision of critical infrastructure with at least one ongoing road project per state.

“This project is a 73km single carriage way. It links the industrial town of Akamkpa to Biase-Yakurr road. Its frequent plying by industrialists around the area led to its deterioration.

“The shoulders of the road have been completely eroded, while the entire alignment is riddled with alligator cracks, as well as characterized by potholes.

“The scope of work for the contract entails site clearance of shoulders, scarification of the existing failed carriage way and the provision of asphaltic concrete surfacing.

“The scope of work also include, surface dressing of shoulders, concrete lined drains, de-silting of blocked culverts, reinforced concrete pipe culverts among others.

“When completed, the road will greatly reduce vehicle operation maintenance cost, improve travel time, reduce accidents, as well as loss of lives and properties.

“It will also enhance the socio-economic wellbeing of the people along the corridor, generate employment opportunities for both skilled and unskilled labour and assist in the fight against crime,” he said.

The Director in charge of Highways, Construction and Rehabilitations in the Ministry, Yemi Oguntominiyi, said the massive infrastructure development was embarked on by the present administration across the six geopolitical zones in the country.

According to Mr Oguntominiyi, the rehabilitation is aimed at providing the much needed impetus to stimulate the economy and improve the lives of the people.

The minister and his entourage also inspected other completed and ongoing rehabilitation projects along the Calabar-Ikom-Ogoja federal highway led by the Federal Controller of Works in the state, Bassey Nsentip.

(NAN)

Subscribe to Our Newsletter

Get the latest news, articles, and updates delivered straight to your inbox.

We don’t spam! Read our privacy policy for more info.

Check your inbox or spam folder to confirm your subscription.

Share this post:

Share on X (Twitter) Share on Facebook Share on Pinterest Share on LinkedIn Share on Email Share on WhatsApp Share on Telegram
Cross River News, News Tags:Calabar - Ogoja Highway

Post navigation

Previous Post: APC Cross River State Waiting for Gordot…
Next Post: “I Choose To Decamp To APC Before Buhari” – Bolaji Anani

Related Posts

  • C’River Sacks 12 School Principals, Suspends Six Others Cross River News
  • Cross River State Owes LG Pensioners N4.7bn Cross River News
  • “I Will Lead Protest Against Ayade If…” – AIG (Rtd) Mbu J. Mbu Cross River News
  • Four Former C’River State Govs To Be Honoured At 2025 Carnival Calabar Kickoff! News
  • Merry Christmas and Happy New Year News
  • APC Crisis: Court Bars Etim John Led Exco From Parading Self Cross River News

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Recent Comments

  • Atakor shedrack ugbut on PRESS RELEASE: Disregard The Latest Mischief Against Peter Akpanke
  • Desmond Samson on C’River Senator Raises Hope As Bulldozers Begin Work On Ring Road
  • Wofai-Agbam on Cross River Politics, Christmas/New Year Rice & The Rest Of Us!
  • Fay on Former C’River Federal Lawmaker Essien Ayi Dumps PDP, Joins APC!

ADVERT: Click to Watch!

https://calitown.com/wp-content/uploads/2017/10/VID-20170928-WA0003.mp4
  • US-Africa-China Trade: What’s In For CR? Community
  • Ugep: Girl Dumps Baby In Gutter Cross River News
  • OGOJA/YALA REPS POSITION: Why Ukelle Has To Put Its Best Foot Forward Cross River News
  • Jarigbe Agom Closes Door On Ayade’s Senatorial Ambition In Crushing Defeat Cross River News
  • 18 Make Final List Of Cross River Most Beautiful Girl, 3rd Edition Cross River News
  • C’River Gov’s Aide Says CR First Lady Is A Blessing To The World Cross River News
  • Peter Akpanke Receives Large Solidarity Visit Crowd Cross River News
  • Deconstructing The Imoke Legacy Features

CALITOWN
...News, Here, Everytime

Quick Menu

  • Home
  • News
    • Cross River News
  • Features
  • Community
  • Inspirational

Copyright © 2021 calitown
172 Greenwood Avenue , Hull. East Yorkshire. HU6 9NY

Powered by PressBook News WordPress theme